90-property solar PV scaffolding delivered in 30 days

  • Client: LHP (via Fortem)
  • Framework: Fortem
  • Scope: Solar PV access scaffolding
  • Scale: 90 properties
  • Programme: 30 days
  • Sector: Social housing
The challenge

A 90-property solar PV programme delivered on the Fortem framework, requiring scaffolding access across all properties to a tight 30-day programme. Solar PV access on occupied social housing demands resident-safe systems, sequencing coordinated with the PV installation teams, and the crew depth to maintain a high property-per-week rate without compromising safety.

What we delivered

SSG Scaffolding provided roof access and edge protection across all 90 properties, sequenced with the electrical and PV installation teams so access was ready when installers needed it and removed promptly on completion. Resident-safe systems and statutory inspection were maintained throughout.

The result

All 90 properties scaffolded and the programme delivered within the 30-day window, with zero RIDDOR-reportable incidents and on-time completion - demonstrating the crew depth and sequencing discipline that programme-scale solar access requires.

Key figures
  • 90 properties
  • 30-day programme
  • Zero incidents
  • Fortem framework delivery