A 9-block mid-rise decarbonisation retrofit at Matson Avenue, Gloucester, delivered with Synergize Ltd. Mid-rise retrofit scaffolding combines height, scale, and resident-occupied delivery, requiring designed access across multiple blocks, support for the retrofit measures being installed, and sequencing that keeps the programme moving across the site.
SSG Scaffolding provided access scaffolding across all 9 blocks, designed for mid-rise height and the retrofit works being carried out, with resident-safe systems and statutory inspection maintained throughout. Access was sequenced with the retrofit trades to support the wider programme.
Access delivered across all 9 blocks to support the decarbonisation retrofit, with consistent on-time, zero-incident performance, working alongside Synergize Ltd as part of the wider retrofit delivery.
Survey response within 48 hours. Quote within 5 working days. Operational hubs across England.