24-plot timber-frame residential development

  • Client: Purehaus
  • Location: Drighlington
  • Scope: New-build construction scaffolding
  • Scale: 24 plots, 3-4 storeys, timber-framed
  • Programme: 4-5 months, all plots simultaneously
  • Sector: Construction sites
The challenge

A 24-plot residential development at Drighlington for Purehaus, comprising 3-4 storey timber-framed houses. The project required all 24 structures to be scaffolded simultaneously and maintained over a 4-5 month construction programme - a significant coordination and crew-depth challenge, with access needing to keep pace with the build across the entire site at once.

What we delivered

SSG Scaffolding planned and delivered access scaffolding across all 24 plots in parallel, designed for 3-4 storey timber-frame construction and sequenced to support the build programme from first lift through to strike. Statutory weekly inspection and full RAMS were maintained across the site throughout the 4-5 month duration.

The result

All 24 plots scaffolded simultaneously and maintained across the full 4-5 month programme, supporting the construction sequence and helping keep the development on schedule, delivered incident-free.

Key figures
  • 24 plots, 3-4 storeys
  • Timber-frame construction
  • All plots scaffolded simultaneously
  • 4-5 month programme
  • Zero incidents